Split Pile/Shaft Lateral Modulus Testing

Split Lateral assembly using two O-cellsLateral testing of specific soil and rock formations are performed with horizontal Osterberg Cell assemblies cast into a shaft or pile

In general, the split cylinder test is not carried out as a typical lateral load test would be performed (ASTM D3966). Instead, an O-cell is cast within a section of the test shaft with the axis of the cell perpendicular to the axis of the shaft. When the O-cell is pressurized, each “semi-cylinder” is loaded laterally from within, against the surrounding soil or rock formation. Load and lateral displacement information are recorded and the data is tabulated and plotted for use by the Engineer.
Split lateral assembly using a single O-cell


Click here for a printer friendly PDF datasheet on split lateral modulus testing