Loadtest News
Click the document title to read the article in it's entirety.
Loadtest VIDEO Long Version...
Year Publication Title 2005 Deep Foundations Institute O-cell in High Capacity Augercast Piles 2005 European Foundations Load Testing - Double First 2004 European Foundations Pile Testing - High Society 1996 Engineering News Record Loadtest Supports Savings 1995 Civil Engineering...
European Foundation articleFOR IMMEDIATE RELEASE Loadtest, Inc. sets World Record 278 MN (31,350 Ton)Static Load Test Gainesville, FL – Loadtest, Inc. announces a new world record static load test achieving 31,350 tons (278 MN) on a single 118-inch (3m) diameter...
WORLD RECORD 31,350 TON LOAD TEST! In March 2005, a new world record for deep foundation load testing of 279 MN was set in Incheon, Korea on the Incheon 2nd Link Bridge - Causeway project. This mega-structure will link the...
On February 18, 1997 a new World Load Testing Record was set by LOADTEST, Inc. at the Florida Department of Transportation’s State Route 20 bridge over the Apalachicola River, near Blountstown, Florida. A total load of 15,000 tons (135 MN)...
On January 30, 2001 a new world record for deep foundation load testing of 16875 tons (150.1 MN) was set by Loadtest, Inc. in Tucson Arizona at the I-10/I-19 Interchange project, exceeding Loadtest's 1997 world record by 2,000 tons (17.8...
On August 27, 2003 a new world record for deep foundation load testing of 18,400 tons (163 MN) was set by Loadtest in Meigs County, West Virginia on the Pomeroy-Mason Ohio River Bridge project, exceeding a previous Loadtest world record...
Year Location Load 2005 Incheon 2nd Link, Incheon Korea 31,350 tons (279 MN) 2005 Incheon 2nd Link, Incheon Korea 26,526 tons (236 MN) 2005 Incheon 2nd Link, Incheon Korea 18,658 tons (166 MN) 2003 Pomeroy OH - Mason WV,...